The Master’s College Master Plan

Volume I

INTRODUCTION
1.0 EXECUTIVE SUMMARY
2.0 PROJECT DESCRIPTION
3.0 ENVIRONMENTAL AND REGULATORY SETTING
4.0 CUMULATIVE IMPACTS
5.0 ENVIRONMENTAL IMPACT ANALYSIS
5.1 Visual Resources
5.2 Air Quality
5.3 Biological Resources
5.4 Geology and Soils
5.5 Hydrology and Water Quality
5.6 Land Use and Planning
5.7 Noise
5.8 Population and Housing
5.9 Public Services
5.9.1 Fire Services
5.9.2 Sheriff Services
5.10 Transportation and Circulation
5.11 Utilities and Service Systems
5.11.1 Water Services
5.11.2 Solid Waste
5.11.3 Wastewater Disposal
6.0 EFFECTS NOT FOUND TO BE SIGNIFICANT
7.0 PROJECT ALTERNATIVES
8.0 UNAVOIDABLE SIGNIFICANT IMPACTS
9.0 SIGNIFICANT IRREVERSIBLE ENVIRONMENTAL CHANGES
10.0 GROWTH-INDUCING IMPACTS
11.0 LIST OF PREPARERS AND PERSONS CONSULTED
12.0 REFERENCES

Volume II

Volume III

5.4 Geotechnical Reports
EIR Level Review of Preliminary Grading Plan, Alan E. Seward Engineering Geology, Inc.
Engineering Geology and Geotechnical Review, Alan E. Seward Engineering Geology, Inc.
Preliminary Geotechnical Investigation,Gorian & Associates, Inc.
Preliminary Grading Plan Review,Gorian & Associates, Inc.
5.5 Hydrology and Water Quality
Hydrology and Water Quality Study
Water Quality Technical Memo Addendum
Revised Site Plan Evaluation Technical Memorandum
5.7 Noise Modeling Output Files
Existing Noise Measurements
Calculated ADT Volumes by Scenario
5.9.1 Fire Department Correspondence
5.10 Traffic Studies
Traffic Impact Analysis, February 2007
Traffic Impact Analysis, June 2008
Parking Analysis
5.11.2 Solid Waste Disposal Data

Revised Biological Resources Section

Revised Section 5.3